My psychiatrist told me I'm going crazy.  I told him, "If you don't mind, I'd like a second opinion."  He said, "All right. You're ugly too!"

When it comes to TJIs we should take a cue from Rodney Dangerfield and get a second opinion or at least a second look at our joist layout. We send our plans out to the lumber company. The lumber company creates a truss joist layout, develops an estimate, and once agreed upon sends the joists to the job. Simple right?

It can be, but what I have found is that more times than not the joist layout is incredibly inefficient often having extra joists which create hundreds of dollars per home in additional cost. Why? Well often the plans are not complete at the initial bid stage, and everyone is in a hurry to get the bids out resulting in multiple mistakes. I have seen joists that are far too deep, spaced too close together and as well as extra unnecessary joists. I have also witnessed joist layouts setup inappropriately.

Don't get me wrong the joists must meet the governing code as well as the customer code in terms of deflection, however the situations that I am referring to far exceed both. In one case recently on the West Coast a builder was paying an additional $700 on a home because the layout was inefficient. This can add up to serious moola when applied to a multiplier.

My advice is talk to your supplier and have them take a second look at your joist layout. With completed plans and a bit of time at his/her disposal I am confident your second opinion will be much more favorable than that given by Rodney's psychiatrist.

Related Stories

Construction

A Case for Compact Duct Layouts

Conventional duct layouts place HVAC supply registers near exterior walls because those locations used to make sense: Homes of the past were poorly…
Design Details

Design Details: Above the Fray

In a densely populated Seattle neighbor­hood, two adjacent infill sites were developed: The Lookout and Shake Shacks

Backstory

Backstory: Logical Thinking

How a small architecture and construction firm in Maine became a leader in the prefab and passive House movements

Best Practices

Guest Columnist: Evaluating Risks and Cost Before Buying Land

Finding the right building site with no issues can be trick; that's where scrubbing the lot could help

Business

Selections Strategy

Collaboration holds the key to a smoother selections process that satisfies both client and builder

Best Practices

Light Touch

Understanding these basics will help you create better lighting transitions

Business

Time-Machine Lessons

We ask custom builders: If you could redo your first house or revisit the first years of running your business, what would you do differently?

Leadership

Guest Columnist: Boost the Efficiency of Your Building Process

Valuable insights Architect Robert Hidey gleaned over decades of residential design experience

Backstory

Backstory: Green Gables Opens Up Every Aspect of its Design/Build Process to Clients

"You never want to get to the next phase and realize somebody's not happy."

 

Business

Strategies for Maximizing Profit

Custom home builders talk about what they do on the front end of a project to achieve better margins

Advertisement
boombox1 -
Advertisement
boombox2 -
Advertisement
native1 -

More in Category




Advertisement
native2 -
Advertisement
halfpage1 -